Leave Your Message

Hot-dip Galvanized Heavy-duty Q345 Cuplock Scaffolding

Item

Details

Material

Q355B High-Strength Steel

Surface Finish

Hot-dip Galvanized

Standard Heights

0.6m/ 0.9m /1.2m /1.5m

Ledger Lengths

0.6m/ 0.9m /1.2m /1.5m /1.8m/2.1m/ 2.4m /3.0m

Vertical Load Capacity

≥ 40 kN ≈ 4.08 tons

Compliance Standards

EN12810 / BS1139

Main Components

Standards, Ledgers, Braces, Accessories

Suitable Applications

Bridges, High-rise Buildings, Industrial Projects

    Product Overview

    Zhuozhans Hot-dip Galvanized Heavy-duty Q355B Cuplock Scaffolding offers strong load capacity, fast assembly, and excellent corrosion resistance. Made from high-strength Q345 steel and galvanized for durability, its ideal for demanding projects like bridges, high-rise buildings, and industrial works.

    Key Features of Cuplock Scaffolding System

    Speed Up Your Projects:

      Snap, lock, and build save up to 30% in labor time with our fast cuplock connections.

    Built for Heavy Loads:

      Trust heavy-duty Q345 steel to handle your toughest jobs, safely supporting up to 4 tons.

    Less Parts, Less Hassle:

      Simplified design means fewer components, easier logistics, and lower costs.

    Rock-Solid Stability:

      Precision engineering keeps your structure safe and secure, even on complex builds.

    Long-Lasting Durability

      Hot-dip galvanized protection fights rust and keeps your scaffolding working for years.

    One System, Endless Possibilities

      Perfect for buildings, bridges, power plants, curved façades you name it!

    Certified Quality You Can Trust

      Fully compliant with EN and BS standards for peace of mind on every project.


    Choose Zhuozhan Cuplock scaffold where safety meets savings!

    Product Gallery

    Description

    Explanation

    Product

    cuplock scaffolding

    Type

     Cuplock rod

    Horizontal Rod

    Size

    600-3000mm

    600-1500mm

    Wall thickness

    3.5mm/3.25mm

    3.25mm/2.75mm

    Standard

    EN 12810 / 12811     BS1139

    Surface treatment

    Hot-dip galvanizing/Electro-galvanizing/Spray painting

    Application

    Construction engineering, Bridges and transportation, industry and energy, etc

    Packaging

    Steel PalletPlastic-Wrapped BundlesOr package as per the customer's requirements

    Delivery time

    30 to 45 days from the date of drawing confirmation.

    Payment Terms

     T/T or L/C at sight

    Product parameters

     Cuplock scaffold Vertical Bars

    Length(mm)

    Tube thickness(mm)

    Material

    Tube diameter(mm)

    Weight(kg)

    Number of roots/ton

    Meters/tons

    Surface treatment

    600

    3.5

    Q355

    48

    3.69

    271

    192

    Hot-dip galvanizing120μm

    900

    3.5

    Q355

    48

    4.92

    203

    203

    Hot-dip galvanizing120μm

    1200

    3.5

    Q355

    48

    6.85

    146

    190

    Hot-dip galvanizing120μm

    1500

    3.5

    Q355

    48

    8.78

    114

    183

    Hot-dip galvanizing120μm

    1800

    3.5

    Q355

    48

    9.95

    100

    190

    Hot-dip galvanizing120μm

    2100

    3.5

    Q355

    48

    11.08

    90

    198

    Hot-dip galvanizing120μm

    2400

    3.5

    Q355

    48

    13.05

    76

    190

    Hot-dip galvanizing120μm

    3000

    3.5

    Q355

    48

    16.15

    62

    192

    Hot-dip galvanizing120μm

     Cuplock scaffold Vertical Bars

    Length(mm)

    Tube thickness(mm)

    Material

    Tube diameter(mm)

    Weight(kg)

    Number of roots/ton

    Meters/tons

    Surface treatment

    600

    3.25

    Q355

    48

    3.51

    284

    284

    Hot-dip galvanizing120μm

    900

    3.25

    Q355

    48

    4.56

    219

    219

    Hot-dip galvanizing120μm

    1200

    3.25

    Q355

    48

    6.37

    157

    157

    Hot-dip galvanizing120μm

    1500

    3.25

    Q355

    48

    7.42

    135

    135

    Hot-dip galvanizing120μm

    1800

    3.25

    Q355

    48

    9.23

    108

    108

    Hot-dip galvanizing120μm

    2100

    3.25

    Q355

    48

    10.3

    97

    97

    Hot-dip galvanizing120μm

    2400

    3.25

    Q355

    48

    12.09

    83

    83

    Hot-dip galvanizing120μm

    3000

    3.25

    Q355

    48

    14.95

    67

    67

    Hot-dip galvanizing120μm

     Cuplock scaffold Vertical Bars

    Length(mm)

    Tube thickness(mm)

    Material

    Tube diameter(mm)

    Weight(kg)

    Number of roots/ton

    Meters/tons

    Surface treatment

    600

    2.75

    Q355

    48

    3.15

    317

    228

    Hot-dip galvanizing120μm

    900

    2.75

    Q355

    48

    4.02

    249

    225

    Hot-dip galvanizing120μm

    1200

    2.75

    Q355

    48

    5.65

    177

    233

    Hot-dip galvanizing120μm

    1500

    2.75

    Q355

    48

    6.52

    153

    221

    Hot-dip galvanizing120μm

    1800

    2.75

    Q355

    48

    8.15

    123

    229

    Hot-dip galvanizing120μm

    2100

    2.75

    Q355

    48

    9.02

    111

    212

    Hot-dip galvanizing120μm

    2400

    2.75

    Q355

    48

    10.65

    94

    224

    Hot-dip galvanizing120μm

    3000

    2.75

    Q355

    48

    13.15

    76

    225

    Hot-dip galvanizing120μm

     Cuplock scaffold Horizontal Bars

    Length(mm)

    Tube thickness(mm)

    Material

    Tube diameter(mm)

    Weight(kg)

    Number of roots/ton

    Meters/tons

    Surface treatment

    600

    3.5

    Q355

    48

    3.51

    284

    284

    Hot-dip galvanizing120μm

    900

    3.5

    Q355

    48

    4.56

    219

    219

    Hot-dip galvanizing120μm

    1200

    3.5

    Q355

    48

    6.37

    157

    157

    Hot-dip galvanizing120μm

    1500

    3.5

    Q355

    48

    7.42

    135

    135

    Hot-dip galvanizing120μm

     Cuplock scaffold Horizontal Bars

    Length(mm)

    Tube thickness(mm)

    Material

    Tube diameter(mm)

    Weight(kg)

    Number of roots/ton

    Meters/tons

    Surface treatment

    600

    3.25

    Q355

    48

    2.26

    284

    284

    Hot-dip galvanizing120μm

    900

    3.25

    Q355

    48

    3.31

    219

    219

    Hot-dip galvanizing120μm

    1200

    3.25

    Q355

    48

    4.36

    157

    157

    Hot-dip galvanizing120μm

    1500

    3.25

    Q355

    48

    5.4

    135

    135

    Hot-dip galvanizing120μm

     Cuplock scaffold Horizontal Bars

    Length(mm)

    Tube thickness(mm)

    Material

    Tube diameter(mm)

    Weight(kg)

    Number of roots/ton

    Meters/tons

    Surface treatment

    600

    2.75

    Q355

    48

    1.94

    515

    283

    Hot-dip galvanizing120μm

    900

    2.75

    Q355

    48

    2.81

    356

    303

    Hot-dip galvanizing120μm

    1200

    2.75

    Q355

    48

    3.68

    272

    313

    Hot-dip galvanizing120μm

    1500

    2.75

    Q355

    48

    4.55

    220

    319

    Hot-dip galvanizing120μm

    Project Case

    Guizhou Liupanshui Expressway Viaduct Construction

    Project location: Liupanshui, Guizhou Province, China

    Construction time: April 2023 – December 2023

    Project type: Highway viaduct project

    Project challenges:

    Liupanshui has mountainous terrain, and the height of bridge piers is generally over 30 meters. The span of some cast-in-place beams is over 50 meters, which requires extremely high bearing capacity and overall stability of the scaffolding system. The construction period is tight, and there is a lot of rain in spring and summer, which also puts higher requirements on the corrosion resistance of the scaffolding.

    Zhuozhan solution:

    Zhuozhan provides hot-dip galvanized heavy-duty Q345 cup-hook scaffolding system for the project, which is used to set up high formwork platforms and bridge pier outsourcing scaffolding. The cup-hook system has strong node rigidity, fast assembly, and high bearing capacity, which is very suitable for high height and high load conditions. In view of the local rainy environment, the hot-dip galvanizing process was selected to ensure that the scaffolding is rust-free for long-term outdoor use. At the same time, the Zhuozhan technical team optimized the pole layout plan for the project, reducing materials and costs.

    Project results: 

    The high-support formwork platform passed the third-party inspection, and the bearing capacity meets ≥40kN (about 4 tons)/pole

    The scaffolding erection efficiency increased by about 40%, shortening the construction period by nearly 45 days

    Hot-dip galvanizing protection, no rust problems occurred throughout the project

    Zero safety accidents, the project was successfully completed

     

    → Zhuozhan bowl-hook scaffolding-a reliable choice for bridge and high-support formwork construction!

    FAQ

    Q1: What height of formwork project is the cuplock scaffold suitable for?

    Zhuozhan's cup-hook scaffolding system can be easily erected to a formwork platform over 30 meters high. With reasonable pole spacing and support arrangement, it can meet the construction needs of higher or larger spans.

    Q2: How much load can the cup-hook scaffolding withstand?

    The vertical bearing capacity of standard poles can reach 40kN (about 4 tons), which fully meets the heavy-load requirements of large bridges, high formwork and industrial engineering.

    Q3: How effective is the rust prevention of cup-hook type scaffolding?

    Zhuozhan provides hot-dip galvanizing process, which has excellent anti-corrosion performance and can ensure that the scaffolding will be rust-free for a long time even in high humidity and rainy environments.

    Q4: What are the advantages of cup-hook scaffolding compared to traditional fastener-type scaffolding?

    Fast assembly and disassembly, saving construction time

    Simple structure, reducing labor costs

    Strong connection nodes, more stable structure

    Fewer parts, easy to manage and transport

    Leave Your Message